Hello
I am simulating a biomass grinder in Aspen Plus. The feed rate is 100 tonnes per day. Initial size is 200 mm and final size is 40 mm. I am using a jaw crusher type. When I perform integrated economic analysis, it does not give me equipment cost or installation cost of the crusher. What could be the reason. Am I doing something wrong in the mapping?
It gives me two errors:
Rate is out of range and product size is out of range.
How do I know which are the suitable ranges for an equipment?