Z12 = [1.5609 + 0.67155i 0.5203 + 0.22385i 0.5203 + 0.22385i

0.5203 + 0.22385i 1.5609 + 0.67155i 0.5203+ 0.22385i

0.5203+ 0.22385i 0.5203 + 0.22385i 1.5609 + 0.67155i] ohms/km of 3 km length.

Need to know each step to convert Z12 to Y12 for this three-phase line.