Hello friends. I am a student majoring in electrical engineering. Currently, I am researching and simulating a 2MW grid-tied wind energy system. The problem here is, when I combine the wind turbine with PMSG generator with a resistive load R, the system works. However, when connecting to the control rectifier, the background load R must be bypassed before it can be connected, but at this time, the error system cannot take the voltage and current signals after the PMSG generator can be controlled. . This is a simulation model including (wind turbine + generator + MPPT(TSR) algorithm + controlled rectifier). Please take a look and help me to complete my research. I sincerely thank you.