The Gaussian output (in GView and as part of the output) report two bonds as:
0.963
0.958
Is the final significant as reported by Gaussian and uncertain term?
Should I report the bond length distance as:
1) 0.005
or
2) 0.01
I tried (1) but I was informed that this was incorrect.
Thanks