Hi,
I want to calculate the amount of feedstock that is needed to produce 1500m^3 biogas per day with anaerobic digestion. I have tried so many different ways to calculate but can't seem to get is quite right. The BMP is 0,204 m^3 CH4/kg VS, the VS content is 90% and TS is 12%. Now I am thinking about this approach:
Total VS = 1500 * 0,6 / 0,204
Biomass [kg] = Total VS / (VS[%] * TS[%])
This gives me 21 tons feedstock per day, which I think sounds a bit too much?