If I want to calculate the slope (velocity) of the absorbance curve at the linear region, how small/large should this region be for the most exact results? Should I go for the region where the substrate converted is less than 5%? Or the longest stretch from zero which gives me R2 = 0.99?

What kind of consistency should I have between results (e.g. if one linear region is shorter than the other, should I get the longest for each, or the most linear for each)?

Are there any agreed-upon standards that published kinetics studies follow?

More Johannes Thomsen's questions See All
Similar questions and discussions