I tried to find a solution for drilling deeper into the earth than before.

This is the first draft from what I got till now.

The optimizations are - a chain drive component for one or more components.

A boring mill to be connected with the first chain drive component.

Movable chains in diameter and a flexible supply line.

Behaviour:

drilling is synchronous (mortis joint) to the chaindrive

before the maximum of load the driller must be lifted again to clean up the borehole

I hope this could solve some trouble - best regards George