I tried to find a solution for drilling deeper into the earth than before.
This is the first draft from what I got till now.
The optimizations are - a chain drive component for one or more components.
A boring mill to be connected with the first chain drive component.
Movable chains in diameter and a flexible supply line.
Behaviour:
drilling is synchronous (mortis joint) to the chaindrive
before the maximum of load the driller must be lifted again to clean up the borehole
I hope this could solve some trouble - best regards George