Processor: Intel(R) Xeon(R) CPU E5-1650 v2 @ 3.50GHz

Installed RAM: 32.0 GB

Cores: 6

Logical Processors: 12

Virtualization: Enabled

System type: 64-bit operating system, x64-based processor

With above configuration of workstation, how far can I increase the memory and no. of. processors in gaussian 09W to use the maximum resources and minimize the time of job?

More Syed Muhammad Saad's questions See All
Similar questions and discussions