Processor: Intel(R) Xeon(R) CPU E5-1650 v2 @ 3.50GHz
Installed RAM: 32.0 GB
Cores: 6
Logical Processors: 12
Virtualization: Enabled
System type: 64-bit operating system, x64-based processor
With above configuration of workstation, how far can I increase the memory and no. of. processors in gaussian 09W to use the maximum resources and minimize the time of job?