In a study of surface (10 cm) soil moisture modelling, where there is no soil moisture measurement network, we want to use a portable TDR for data measurement in 20 points at a 50 ha catchment. We can have data measurement in just two or three times in a week. Pleas give me your critical comments.
Many thanks!