When I use TIE constraint to tie the two concrete surfaces in my model and analyse it as static general under cyclic loading with a time period of 65s the analysis slows down at the time period of some seconds as shown in the attached figure. I have tried almost everything to fasten up the process. Should I let it run?

Otherwise what kind of a constraint should I use to tie the two surfaces because without that the analysis runs fine