Hi everyone,
I am new to the field of industrial engineering. I need to formulate a gams model for a permutation flowshop scheduling problem. I will appreciate if someone can send me a code example with interpretation of how to extract the sequence of jobs that optimize certain objective from the gams output.
Thanks in advance.