Hi all,
I have a question about design flow estimation at ungauged sites. Using only daily flow data at multiple sites for tributaries that drain into main river and the gross or effective drainage area, how can one estimate the design flow (e.g Q100) at any ungauged location on the river? A simple but robust approach is much appreciated.
There is a gauge at some point along the river but far off from the target ungauged site.
A step-by-step procedure will be helpful as well any existing software tool for implementing the method.
Thanks.