Hi all,

I am currently comparing two groups (control/exp) using SEM. Each latent construct (5 in total) has at least 8 if not 20 individual indicators, as such I am using appropriate parceling techniques in each. The first step requires I conduct a CFA for each construct of interest - to do so, I must have at least four indicators. In the full SEM, as there are 5 latent constructs in total, to improve overall fit, I wanted to reduce the number of parameters to be estimated to be two indicators for reach latent, rather than three. My question is, is it permissible to run a CFA with three indicators for each individual latent, but in the final SEM - only two indicators (using an appropriate parceling technique - rather than just dropping items).

Similar questions and discussions