I would like to know that is it possible to ignore the O&M costs in comparison with their Capital costs when we are going to find the optimal size of renewable energy sources such as small-scale wind power plants (WPP), photovoltaic (PV) units, and energy storage systems (ESS) in the medium-term planning?