After simulating the IEEE-39 Bus System Benchmark in EMTP-RV software, I introduced faults in the 500 kV transmission system at its various bus locations (one at a time). I am observing very high fault current magnitudes in the connected Transmission Lines . Can someone please specify how much increase in the magnitude of the fault current is deemed to be acceptable when compared with the current magnitude of the normal system operation? Thank you