When I enter the load to the HOMERPro without considering the random variability the peak load is about 17 KW, because of making the load mor realistic I define 5 percent day to day and 10 percent time step random variability, the peak load increase to about 24 KW , so the simulation result shows the component designed regarding the the 24 KW, therefore increase the cost of the project too. How can I solve this problem??

Thanks