When working on photovoltaic systems i found my self using a two stage topology in Simulink (dc/dc with MPPT and dc/ac with PLL and PI controllers).
This structure is widely documented and a lot of work has been done in the literature using it especially on matlab simulink.
Now for power system studies, there is a generic model proposed in WECC modeling guidelines (regc_a, reec_b and repc_a).
What's the difference/relationship between the detailed models used in matlab and the one proposed in the WECC guidelines ?
Thank you in advance for your answers