I have done an experiment on PV panel with variable step-size INC MPPT algorithm

In this figure the duty ratio (D%) of the MPPT starts at 2.9 sec, but the power curve of the PV panel starts at 4.2 sec.

I am confused, is the settling time of the MPPT is calculated from the starting of D% or from the starting of power curve (Ppv)?