I am starting a project to review the Integrated Production Modeling approach in one area of our field. I think is the best way to evaluate the effect of flowing pressure (or back pressure) on the rate and hence improve accuracy of Type Curves. It is also a good way to evaluate the production network under actual operational constraints. Is there anyone doing something similar?