I'm planning to work on optimization of switch allocation in existing distribution network. I have no working on distribution system before. My question is, what are the considerations in moving a sectionalizer from a location to another? Can I just move sectionalizer near the substation to the end side of the network? Is a sectionalizer chosen to be placed in a specific location only?