Dear all,
I am applying MPPT techniques for a 400 KW grid connected system. I use optimization technique to tune PID controller parameters embedded in the MPPT controller. I get the response of the power as shown in the picture. the problem is with the settling and rise time of the power signal. when i use stepinfo command i get too large numbers for both of them. for example i get the rise time equals 75600 s ! and get a rise time that is larger than the settling time ? what may cause such numbers ? and how to get reasonable values ?