I am trying to identify the transfer matrix of a TRMS and I have a set of estimation and validation data. However, I have two types of validation data, one set has been derived by applying the same type of input (as that of estimation data) to the system but at a different time and another one which includes an entirely different form of input. Which one would be a better choice as a validation data ?