Is there any mplus tutorial/notes or mplus application paper on multiple group(knownclass) parallel process gmm or lcga. I am having difficulty with the loglinear parametrization because my model is
process1 WITH process2;
Process1 process2 ON knownclass_variable;
Changing the WITH statement to ON would work OK with logit parameterization but the processes will be sequential-like instead of parallel.
Any worked out example or methodological paper would be helpful.
Thanks