I am doing MIP optimization on conveying capacity increase of pellets by proper silo routing and unloading. I need to specify a constraint saying that once a silo is selected it needs to be filled continuously at each time interval.
But currently, the silo is able to hold and capacity is constant for certain period of time which is not the case in real life. Hence, there exists many number of combinations in which silo can hold the capacity and the model is slow.
Can anyone formulate a constraint which tells the program to fill the silo continuously with certain flow rate and not hold back.
Regards
Pradyumna Krishnan