I am putting together a survey using four established measures: two are 5-point, one is 6-point, and one is 7-point.

Is it acceptable to use different point questions, or should I aim for consistency and make them all the same?

If so, what is the best/advised way of doing so?

Many thanks

More Edward Noon's questions See All
Similar questions and discussions