To my fellow researchers:

I have serious doubts about the AHP process and methodology, and perhaps I have some misconceptions on it. I will be happy to modify them if I am wrong.

We can interchange opinions via RG, which I recommend, or by emails.

I would like to have a deep discussion about the merits and demerits of this system, especially for complex, not for complicated (these terms are not the same), undertakings such as industrial locations,rivers basins, energy generation, city rehabilitation of neglected areas, airports analysis, etc.

For instance the discussion may include aspects such as: (The selection of the field to discuss is free for everybody).:

Validity of pair-wise comparison for criteria and alternatives. Is this procedure correct?

Validity for using criteria weights to evaluate alternatives. Does this procedure have a solid ground?

Rank reversal, not only in AHP but in other models.

How does the DM do when the result shows two or more alternatives with the same score?

Validity of using subjective variations in criteria importance to perform meaningful sensitivity analysis (which is common to all models). Does this procedure have sense?

More Nolberto Munier's questions See All
Similar questions and discussions