19 July 2021 3 5K Report

I'm trying to set up a CV experiment using an Arbin battery cycler, however when I try to save I get an error message saying that the Schedule must contain at least one step (presumably referring to the 'Step/ Limit' tab). I have tried adding a short 'rest' (OCV) step for 10 seconds to the 'Step/ Limit' tab, however when I run the schedule it finishes immediately after the rest step and does not transition to CV.

I've also tried dismissing the error message that says the Schedule must contain at least one step and trying to save anyway, but the Schedule fails to save when I do this.

I've followed the manual and made sure that CV is enabled in the Advanced Options of the configuration file, and I'm able to edit steps under the CV tab. I also followed the example in the manual for setting up a CV schedule, but this resulted in the above error.

Is there an additional setting that I need to change, or have I missed a key step?