Hi everyone.
I have a technical question about Topographic Wetness Index, specifically about DTM preparation for calculating this index.
I have DTM 1m for a very large area.
I know the formula for calculating TWI. I need Flow Accumulation for this.
There is only one important question. Is it enough that I generate Flow direction and then flow accumulation from it.
Or rather, follow the procedure proposed in the ArcHydro module for determining the basin? First, burn the streams in DTM (DEM Reconditioning), and fill the outflow areas (fill sinks function), and only then make the flow direction on the DTM prepared in this way. I wonder if fill sinks will not destroy the TWI results, because the outflow areas should have the largest TWI and this procedure will rule out.
What do you think, what ideas do you have?