How can we properly model Synchronous condensor in ETAP.
Explanation: I have modelled one line diagram of a power facility, and leave the synchronous condenser in the form of Panel only, and then perform the arc flash.
Now client is asking for modeling of each syncronous generator. We have 4 synchronous generators in the facility. I have to model them in the whole one line diagram and then again perform the arc flash study. Can anyone help me in this regard?
Another thing is can you please tell me, what percentage of short circuit current that synchronous generator feeds into the fault location....or during the short circuit. I have searched a lot and found that it contributes 2% short circuit current in the power system. How much this info is valid??