Integration of H2 storage in a two sub-systems electrolyzer and methanation helps to achieve an independent operation of methanation unit to continuously produce synthetic methane . A potential reduction of methane production costs could also be achieved by integrating a hydrogen storage facility in the system. Methanation unit can run on FLH such as 8500h when an intermediate hydrogen storage is integrated and be able to supply sufficent hydrogen. This way running hours of electrolyzer is reduced and hence less electricity is purchased.
The question is how to find out and estimate the appropriate size of hydrogen storage ?