01 January 1970 2 8K Report

Hello,

The researcher plan to conduct a (RCT) to compare a control group with an intervention group. They have provided a (MCID) for the length of stay (LOS) of one day. However, the standard deviation is extremely high at 120, resulting in an unreasonably large sample size requirement of approximately 500,000 participants, which is not feasible for a prospective RCT.

The issue arises from the high variability in LOS.I have set the power at the conventional level of 0.8 and the significance level (α) at 0.05.

could you please help me how to address this issue?

Thank you!

More Bahar Ysr's questions See All
Similar questions and discussions