It is clear that the LCoE for RESs is higher than most other electric power sources. Therefore, if RESs try to bid according to their LCoE, they will be lose in most markets, but I found some papers that try to minimize the cost of a sample Mircrogrid in this way.
However, the operating cost of RESs are much lower than their LCoE, which is mostly related to their investment cost. Moreover, this LCoE is assigned according to their maximum Capacity Factor, according to the availability of the renewable energy. Thus, if available energy don't be harvested, a worse case will happen.
Thereby, I want to ask about their policy for bidding to sell their maximum generated power?