A large diameter 30-year old buried jointed pre-stressed pipeline which has been designed according to AWWA was subjected to a recent earthquake.   It is suspected that the pipeline has developed cracks.  How many of them must be exhumed to prove with 95% confidence level one way or other? And why.

The alternative is to monitor leaks and hope that leaks come before the burst.