20 November 2015 3 9K Report

we have 14-bus IEEE,  and replace one of the existing generators with a renewable generator  (wind or solar). The power capacity of the renewable resource should be equivalent to that of the conventional generator

that it will replace

renewable data is of sufficiently high resolution, at least five-minute resolution.

More Omar Altam's questions See All
Similar questions and discussions