I have a spreadsheet in Excel used for a meta-analysis.

I want to create a funnel plot to check for bias. Creating the scatterplot is easy, but I don't know how to do the confidence intervals in Excel (the lines representing e.g. a triangle).

The articles I have read on this topic are not very clear on explaining exactly what these lines are, or how you add them to a plot (especially in Excel).

Attached is a picture of the scatterplot. The confidence lines are missing, and any advice on how to add and interpret them is appreciated.

On another note, I have used hedges unbiased g, and there are a small amount of huge effect sizes (such as g = 7). Should these be treated as outlier and excluded? Or would it be more prudent to convert the effect sizes to r?

Similar questions and discussions