Currently, I am doing a project in simulating and improving a production line using WITNESS software. However, I do not know how to feed the material from 1 machine to another using labor. I have only managed to move my labor to the 1st machine and he just stopped there afterwards. Can some one guide me the steps on solving this?
Thanks in advance.