PPC cement, coarse aggregate ( mixture of 3/4 th inch & 1/2 inch downgraded stone chips), fine aggregate (coarse sand), and admixture (MasterPolyheed) is used for this construction. 

Fresh density is kept above 2.4 gm per cc. The hardened density requirement is above 2.35 gm per cc. 

Ice is being used to decrease the mixing water temperature. (To avoid hairline crack in the future)

Key concern is to avoid radiation leakage.

The rooms are being constructed in the basement with wall thickness of 5 to 8 feet and slab thickness of 4 to 8.5 feet. Rooms will be used for Oncology treatment and/or Tomotherapy. 

More Debojit Sarker's questions See All
Similar questions and discussions