Hello to everyone. I do my research on the techno-economic analysis of solar-diesel hybrid system for rural electrification in Afghanistan, I read a lot of thesis and articles about subsect in other countries they considered the capital and replacement cost of PV panels, generator, battery and converter. are in techno-economic analysi we just consider the equipment cost or considers the wiring , distribution system ......? . the cause of I could not found such research in Afghanistan I faced to the problem in parts of how can i consider or determine the cost of the equipment in Afghanistan.
so I want to know your suggestion and solution way about it.
thanks