I want to calculate the fixed cost in the urban transportation problem. I think based on the flow and distance, I can define a fixed cost near real-world one. Any one can help me with this problem?
Based on the actual type of your analysis, you can include different type of cost evaluation function. You can use cost of space, cost of time, cost of flow or even cost of transportation legs. The type of your cost, will be related to your analysis. In other words: "What is the purpose of your analysis?"