I want to research about group scheduling on flexible flow shop environment with unrelated parallel machines and sequence dependent setup times. I don’t know how can do it.

also,I want to show that group scheduling is suitable for mentioned situatio.I think this issue can be appropriate as a proposal PHD candidate in industrial Engineering.specially in optimization trend can be applied.my question is witch heuristic or meta-heuristic algorithm can solve this problem ?

More Nasim Bilchi Kangarloo's questions See All
Similar questions and discussions