Is there any guideline for this? I understand the goal, scope, and impact categories should be defined at this point but to how much extent the product system is defined? I wonder if I have to specify the databases I would use, and statistical analysis because once my project is accepted I cannot do many changes to it, and LCA is kind of a loop process with many changes along the way. I hope someone can help me, thanks in advance.