I have modeled two frames on SAP2000 and only different is the number of stories. First on is 3 stories and the second is 21 stories. Surprisingly, the drift of first model was 0.1m and for the 21 stories was 7.0m.
I checked many time to make sure everything else is same.
What went wrong?
Many thanks
Rakan