Hi All,

I am working on the rehabilitation of a fire-damaged structure.

Should I consider the Column below Soil structurally deficient.

visually it doesn't look like fire affected the column below grade.

Should I retrofit whole member or just the section above plinth beam.

as Slab on Grade is a 6" the Plain Concrete Slab which is difficult to chissel/excavate.