09 September 2016 5 5K Report

Hi

I running a job in abaqus for simulating Press-braking operation for cold formed steel.

the problem is "the step time" I set seems quiet long and my computer took longer time to complete the step AND most of the time the computer shut-down in the middle of the step..

MY QUESTION: is it possible to divide the step time to sub-divided step times?

Ex. if my step time is (1), can I make it 4 steps (each = 0.25)?

AND will it effect the output results?

Thanx