Hello everyone,

I am working on a research which involves PV penetration in the grid. I have an Energy Storage System (ESS) which is rated at 25% of the PV Generation . The ESS is assumed to be connected in parallel at the same bus to PVG on the HV side.

I want to know what are the common ways to dispatch ESS in such a case?

As far as I know, the ESS can be dispatched by taking average of PV power of next hour.

However, Can the utility simply dispatch ESS to their desired value?

Thank you in advance,

Sam

More Samundra Gurung's questions See All
Similar questions and discussions