Hello Scholars, I am interested in Economic Lot Scheduling Problems where products are produced in a cyclic pattern. There are some existing modelling approaches, among them extended basic period is more effective than the others. But will someone help me to understand the concept of basic period (which is assumed to be equal for all products) the relationship/ difference between basic period and cycle time for each product?