Trying to get the information to compile my views to suggest alternative method of construction for building project where conventional method of construction is used !!
i.e. Form work and in situ casting.
As per the projects I worked on in India, material cost constituted almost over 80% (formwork, concrete,steel) of project cost (labour being cheap) and wastage of almost 10% was observed overall.
Thus influencing project cost by 7 - 10%.
Reducing the same can increase profit margin for building contractors and control over national reserves.