I am modelling with ARCSWAT for research at a catchment with an area of about 150,00km2 and want to know the advice of other researchers on calibration.

1. Should I do a single site calibration thus calibrating the model with one discharge gauge station or I have to do it with two or more gauge stations at the same time?

2. What will you advise if you have two two discharge gauge stations and you realize the more reliable one is the one in the middle of the catchment and not the most downstream one?

More Kwaku Amaning Adjei's questions See All
Similar questions and discussions