14 Questions 33 Answers 0 Followers
Questions related from Qazi Zafar Iqbal
i have 4000 watts of load in a home the load will be 24 hours running how much size PV model(Array) i need and how much battery bank or storage,in day due to sun light the load will run on PV...
08 August 2016 3,261 23 View
I have Many M files say ` GAdeferrableload.m GAnondeferrableload.m GAinterruptibleload.m GAnoninterruptibleload.m GAmustrunload.m WDO_SG_Code_PL_test1mdeferrableload.m...
03 March 2016 5,569 3 View
Hello, i have 15 m files which are script files and containing code at-least 500 lines each say...
02 February 2016 8,617 2 View
i want to make hybrid power source of solar panel and Diesel Generator can any one help me how it will be done help means via matlab coding examples and suggestions the detail file is attached.
02 February 2016 7,949 3 View
I have Many M files say...
02 February 2016 5,476 2 View
how can i modify crossover and mutation in GA and BPSO? and make GA and BPSO as hybrid so its performance become improved?
02 February 2016 4,466 3 View
How can i integrate solar energy and Diesel Generator to make it one source of energy i.e micro grid and then use for my must run or regular load,comments and code segment will be appreciated.
02 February 2016 9,211 5 View
i want to calculate delay between appliances which are scheduled in particular hours to be run i show on and zero show off,and i am taking the plot of it,i am calculating average and maximum delay...
12 December 2015 7,528 0 View
Hello can any one help me in specifying constraints for appliances like...
12 December 2015 3,573 0 View
Clothesdryer=[1 0 0 0 0 0 0 1 1 1 1 1 1 1 1 1 1 0 0 0 0 1 1 1]; in debug mode when i bring curser on clothesdryer it show all 24 zeros,which i think should show the above string of zeros and one...
12 December 2015 2,267 0 View
How to calculate average and maximum waiting time for appliances scheduling in smart grid ,in matlab need coding help? I have the following...
12 December 2015 6,980 3 View
I have an index file having stereo=[1 0 0 0 0 0 0 1 1 1 1 1 1 1 1 1 1 0 0 0 0 1 1 1]; and aa=find(stereo); now index is refered in my main code file as u(hour)=hour;...
12 December 2015 230 3 View
Simulation scenario Create a mesh network with 20 to 30 nodes. Configure all the standard protocols and check the communication among the nodes. Once communication is according to the standard...
07 July 2011 1,477 3 View
can some one help me in cluster head selection in wireless sensor network i am doing research on cluster head selection in wsn
12 December 2010 4,354 8 View