Hi All, Can I know the steps for design and fabrication of laminar shear box for liquefaction tests?
22 October 2018 7,176 4 View
I am just going through the Tutorial and the piled raft connection in Tutorial 1 of PLAXIS 3D Tutorial Manual caught my attention. How did they arrive at the Tskin,start, max value of 200 kN/m and...
17 October 2018 3,002 3 View
In case of piles in liquefied soil, I have a non-liquefied crust on the top of liquefied soil layer, which is again underlain by non-liquefied soil layer. Using provisions of JRA, do I have to...
23 February 2018 6,296 3 View